2014年4月17日星期四

they encourage the use of the old building material in the past

Changping District Wenbao unit Town God's Temple street has been completely removed, remove the building materials piled up at the side, as is the future in situ reconstruction. The ancient demolition reconstruction repair mode, triggered Cheap Heat Jerseys a public question.

this morning, the Changping District cultural relics management said, take the disintegration of repair measures on Town God's Temple street, is approved by the Municipal Bureau of cultural relics, will ensure that the restoration of the Cheap Timberwolves Jerseys original regulation.

reporter visited the ancient like be eradicated

April 10th afternoon, the reporters came to the Changping District post office in. It stands on Town God's Temple street have disappeared, only the foundation and stacks of bricks. Two workers force, will Cheap Warriors Jerseys be on the foundation of column plinth pry, like the Town God's Temple uprooted. If not next to the cultural monument, it is hard to think of here, he has an ancient.

reporter saw, workers removed carefully, and a clear division of labor. From Town God's Temple to remove blue bricks, tiles, Liang Zhu, Cheap Suns Jerseys is a measurement, classification, number, on display at the side. A worker said, they are in the repair of cultural relics. The old building materials removed, will be rebuilt on the original site, wholly intact to put back, therefore not easily discarded.

however, the repair method of the "disintegration", many members of the public and cultural lovers are in doubt.

questioned the public demolition and reconstruction is necessary?

understand the history of Town God's Temple Wang Liu Jie said, the ancient original covers an area of 1000 square meters, has been the use of a number of units, then supporting the construction have been removed, to now only the apse. "It Is it right? Dangerous? Like to repair? I'm not a good conclusion." Mr. Wang said, but he felt the apse, Cheap Kings Jerseys does not seem to be removed and then rebuilt.

data shows, Town God's Temple temple roof with weeds, steps were also worn no corners, but the main body of the building is complete.

reporter noted that, in accordance with the "regulations Chinese cultural relics protection criteria", demolition of Town God's Temple street reconstruction, belongs to a key repair engineering. "Standards" emphasized the key restoration project, with all the disintegration repair method, through the member after the disintegration repair, remove hidden dangers should be comprehensive, ensure the long time no longer repair.

official response to the disintegration of repair is a helpless

this morning, the Changping District cultural relics management director Zhang Jianwei, Town God's Temple District Wenbao unit Liu Jie, really is repair, the disassembling overhaul, also it is a helpless.

uses the unit of Changping District post office also found during inspections, cracks, and ground subsidence phenomenon ancient wall, likely to collapse, endanger personal safety. The examination and approval by the Municipal Bureau of cultural relics, the disintegration of repair measures.

Zhang Jianwei said, in the overhaul, they encourage the use of the old building material in the past, to ensure the restoration of the original regulation, project is expected to be completed in October this year.

Zhang Jianwei said, the post office as Liu Jie Cheng Huang >

相关的主题文章:

没有评论:

发表评论